By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
CTN News-Chiang Rai TimesCTN News-Chiang Rai TimesCTN News-Chiang Rai Times
  • Home
  • Chiang Rai News
  • News
    • Crime
    • Northern Thailand
    • Southern Thailand
    • News Asia
    • India
    • China
    • World News
  • Business
    • Sponsored
    • PR News
  • Entertainment
    • Lifestyles
  • Health
  • Politics
  • Social Media
  • Sports
  • Tech
  • Weather
Reading: Flood Prevention Work in Mae Sai-Tachileik Misses June Deadline
Share
Notification Show More
Font ResizerAa
CTN News-Chiang Rai TimesCTN News-Chiang Rai Times
Font ResizerAa
  • Chiang Rai News
  • Regonal News
  • Politics
  • Northern Thailand
  • Crime
  • Business
  • Sports
  • Weather
  • Home
  • Chiang Rai News
  • News
    • Crime
    • Northern Thailand
    • Southern Thailand
    • News Asia
    • India
    • China
    • World News
  • Business
    • Sponsored
    • PR News
  • Entertainment
    • Lifestyles
  • Health
  • Politics
  • Social Media
  • Sports
  • Tech
  • Weather
Follow US
  • Advertise
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
CTN News-Chiang Rai Times > Chiang Rai News > Flood Prevention Work in Mae Sai-Tachileik Misses June Deadline
Chiang Rai News

Flood Prevention Work in Mae Sai-Tachileik Misses June Deadline

Geoff Thomas
Last updated: July 1, 2025 6:18 am
Geoff Thomas - Freelance Journalist
11 hours ago
Share
Flood Prevention Work in Mae Sai-Tachileik
SHARE

CHIANG RAI – Flood protection efforts for Mae Sai and Tachileik have not finished as planned by the end of June. The main work includes building riverbank barriers and dredging the Mae Sai and Ruak rivers.

Buildings along the riverbanks are still blocking the water flow on both sides, and only a small part of the dredging on the Myanmar side has been done.

The Royal Thai Army Engineers and the Third Army Area, along with local agencies, are still working on temporary and semi-permanent flood barriers along the Mae Sai River in Chiang Rai, covering about 3 kilometres.

Flood Prevention Work in Mae Sai-Tachileik

Dredging along the Ruak River, which stretches for about 32 kilometres, started on 18 April. The goal was to finish everything by 30 June 2025.

The project included work across several communities, from Hua Fai, Sai Lom Joy, Koh Sai and Mai Lung Khon. Most areas are not fully complete yet. The Mai Lung Khon community is closest to finishing, with riverbank protection and fences already installed.

Only the placement of large sandbags remains. Other locations are making similar progress.

Dredging along the Ruak River shows mixed results. The Third Army Area has managed about 84% of its 14-kilometre section. The Royal Thai Army Engineers are at about 69% of their 18-kilometre stretch.

On the Myanmar side of the Mae Sai River, out of 12.8 kilometres agreed by both countries, only about 6% is done since work began on 7 June. Myanmar has said it will finish within 40 days.

Flood Prevention Work in Mae Sai-Tachileik

Mae Sai district chief Warayut Khomboon said the flood barrier construction will miss the 30 June deadline. Several riverside buildings still need to be demolished, including those near the first Mae Sai River bridge. The hope is to finish all demolition and barrier work by 15 July.

Reports confirm that both Thai and Myanmar authorities have found buildings encroaching along the Sai River, narrowing the channel and worsening floods when water levels rise.

The severe flooding in September and October last year caused heavy damage. Myanmar has already removed 45 such structures, with about 31 left to clear.

On the Thai side, 24 buildings have been demolished so far. Some, however, remain because they are large, multi-storey blocks with eroded foundations. The Department of Public Works and Town & Country Planning is handling these removals.

After this, the Army’s engineers will grade the land and set piles for the next stage of flood protection measures suited to each site.

Related Mae Sai News:

Chiang Rai Police Capture Woman Wanted Since 2019 in Mae Sai

 

TAGGED:chiang raiflood barriersFlood ProtectionMae Sai
Share This Article
Facebook Email Print
ByGeoff Thomas
Freelance Journalist
Follow:
Geoff Thomas is an award winning journalist known for his sharp insights and no-nonsense reporting style. Over the years he has worked for Reuters and the Canadian Press covering everything from political scandals to human interest stories. He brings a clear and direct approach to his work.
Previous Article Chiang Rai's NCAA Charges 20 With Corruption Chiang Rai’s NACC Charges 20 With Corruption Over School Repair Funds
Next Article Bangkok Airways, Mae Hong Son Mae Hong Son Airport Flightless After Bangkok Airways Ends Service

SOi Dog FOundation

Trending News

IndiGo to Introduce New Business Class Seats to Bangkok and Phuket.
IndiGo to Introduce Cheap Business Class Seats to Bangkok and Phuket
India
Bangkok Airways, Mae Hong Son
Mae Hong Son Airport Flightless After Bangkok Airways Ends Service
News
Chiang Rai's NCAA Charges 20 With Corruption
Chiang Rai’s NACC Charges 20 With Corruption Over School Repair Funds
Chiang Rai News
MT5
How to Place and Manage Orders in MT5 Like a Pro
Finance

Make Optimized Content in Minutes

rightblogger

Download Our App

ctn dark

The Chiang Rai Times was launched in 2007 as Communi Thai a print magazine that was published monthly on stories and events in Chiang Rai City.

About Us

  • CTN News Journalist
  • Contact US
  • Download Our App
  • About CTN News

Policy

  • Cookie Policy
  • CTN Privacy Policy
  • Our Advertising Policy
  • Advertising Disclaimer

Top Categories

  • News
  • Crime
  • Chiang Rai News
  • Northern Thailand

Find Us on Social Media

Copyright © 2025 CTN News Media Inc.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?